Project: Charters

Project Overview

Construction of a new five-storey apartment block in the borough of Hammersmith & Fulham started in June 2019 with the demolition of the previous building and the installation of contiguous piled retaining walls along the full site perimeter.

The building will have a full size basement with residential living space and Grade 3 waterproofing. The basement formation level falls within the sands and gravels of the Kempton Park strata, and a detailed geotechnical analysis was undertaken to justify the design of a 500mm thick raft foundation in lieu of internal piles, achieving a significant cost saving. Long term settlement analysis of the over-consolidated London clay substrata was undertaken.

The superstructure of the building consists of a reinforced concrete frame with flat slabs, stability shear walls and columns.

Like What You See?
If you are looking for a consultant for your very own project, contact us today and find out how we can help you achieve your dream property.